Builders Resources

Approved Plan of Development

Approved Plan of development

Acoustic Report

Acoustic Report

BAL Assessment

BAL Assessment

Dual Occupancy Lots

Dual Occupancy Lots

Stage 1 & 2

Council Approved Civil Engineering Drawings - Stage 1
Electrical & Street Lights - Stage 1 & 2
Level 1 Geotechnical Report for Stage 1 & 2 Earthworks
NBN Stage 1 & 2
Neighbourhood Plan - Stage 1 + 2
As-Constructed Sewer & Stormwater Drawings - Stage 1
As-Constructed Sewer & Stormwater Drawings - Stage 2

Stage 3

Preliminary Survey Plan - Allocated Property / Street Address
Council Approved Civil Engineering Drawings
As-Constructed Sewer & Stormwater Drawings
Compaction Report
Electrical & Street Lights
Statement by Cadastral Surveyor - Harvest Rise - Lots 57-87 and 89-100 - B&P Surveys
Neighbourhood Plan
Level 1 Geotechnical Report
Harvest Rise Survey Plan

Stage 4

Neighbourhood Plan
As-Constructed Sewer House Connections
As-Constructed Sewer Main Lines
As-Constructed Stormwater
As-Constructed Water Reticulation
Level 1 Geotechnical Inspection and Testing Harvest Rise Estate
Survey Plans

Stage 5

Neighbourhood Plan
As Constructed Sewer Mains
Compaction Report
Compaction Report Material Test Report 00-3 Allotment
As Constructed Water
Compaction Report Material Test Report 00-1 Allotment
Compaction Report Material Test Report 00-2 Allotment
Survey plan
WAE Sewer HC
WAE Stormwater

Stage 6

Neighbourhood Plan
Registered Survey Plan
As Constructed Drawings - Sewer
As Constructed Drawings - Water
As Constructed Drawings - Lot Levels
As Constructed Drawings - Sewer HC
As Constructed Drawings - Sewer and Water
NBNAs Built Works Plan
As Constructed Stormwater

Stage 6 & 7

Street Frontages
Acoustic Overlay Map
Bushfire Hazard Overlay Map
Neighbourhood Plans
Soil Compaction Report
Design Guidelines

Stage 7

Registered Survey Plan
Disclosure Plans
NBN Works Plan
As-Constructed Sewer
As-Constructed Sewer HCs
As-Constructed Water
As-Constructed Stormwater
As-Constructed Lot Levels

Stage 8

Neighbourhood Plan
Design Guidelines
As Constructed Lot Levels
As Constructed Stormwater & Sewer drawings
Survey Plan
Design Drawings Pit and Pit Layout
Design Drawings Install Transformer Conduits Cables Streetlight Pits
As Constructed Water Reticulation
Compaction Report

Stage 9 & 10

Neighbourhood Plan - Stage 9
Plan of Subdivision -Stage 9
As Constructed - Stage 9
As-Compaction Report - Stage 9
As-Constructed Water Reticulation - Stage 9A & 10
As-Constructed Sewer Main - Stage 9A & 10
As-Constructed Sewer House Connections - Stage 9A & 10
As-Constructed Stormwater - Stage 9A & Stage 10
Compaction Report - Stage 9A
As-Constructed Lot Levels - Stage 10
Neighbourhood plan - Stage 10
Design Guidelines - Stage 10
Compaction Report Earthworks Inspection & Testing June 2019 - Stage 10
Compaction Report Earthworks Inspection & Testing Dec 2019 - Stage 10
Approved Survey Plan - Stage 10

Stage 11

File URL is missing or incorrect.
Registered Survey Plan
Compaction Report Material Test Report 00-1 Allotment
File URL is missing or incorrect.
File URL is missing or incorrect.
As-Constructed Water Reticulation